CA Johnson Preparatory Academy Additions & Renovations

CA Johnson Preparatory Academy Additions & Renovations Work Description: CA Johnson consists of a large renovation of the existing school classroom space and a 73,000 SF addition of a gymnasium with full men & women locker facilities and a 600 seat auditorium with full stage fly/rigging equipment and orchestra pit. New construction included masonry block […]

Transient Student Barracks at Fort Bragg

Transient Student Barracks – Fort Bragg Work Description: Transient Student Barracks is a five story dormitory with a total of 90 rooms. There are 18 rooms per floor. Each floor has its own laundry room and lounge area. The apartments are two-bedroom, one-bath dwelling units with a kitchen. The TSB will house 180 single personnel […]

Repair Receptee Barracks Building 1877

Repair Receptee Barracks Building 1877 Work Description: The scope of this project focused on repairing already failed or failing components of the 480 person Reception Barracks Building 1877 (58,000 SF). This was a very thorough renovation project that repaired or replaced every major system in the building. Tyler Con-struction coordinated the Designer of Record and […]

VA Parking Garage

VA Parking Garage Work Description: Project included the construction of a four-story, precast parking structure on the southwest edge of campus, directly to the southwest of the existing Mental Health Clinic Building 106. It has 418 parking spaces and is 140,478 SF. Key features of the structure include fire protection (alarm and suppression), suicide prevention […]

University of South Carolina School of Nursing

University of South Carolina School of Nursing Work Description: The renovation of the 4th floor Classroom 409 was approximately 3605 sqft. During the renovation the rest of the 6 story building was occupied. Work included demoing out the entire room floor to ceiling and disposing of materials through a trash shoot. We used a HEPA […]

The Lourie Center

The Lourie Center Work Description: The Lourie Center operates as a multi-purpose senior center, offering fitness classes, gym equipment, lifelong learning opportunities, and programs in art and culture, while also serving as a community hub for older adults. Tyler Construction, in collaboration with GMK Associates, delivered a refreshed, modernized lobby designed to better support the […]

Taylor House at the University of South Carolina

Taylor House at the University of South Carolina Work Description: Tyler Construction completed the historic renovation of theTaylor House, a three-story, 13,000-square-foot facility with a full basement located at the University of South Carolina. The project scope included comprehensive interior finish upgrades, the installation of new ADA-compliant restrooms, and the addition of a LULA elevator. […]

St. Peter’s Catholic Church

St. Peter’s Catholic Church Work Description: Tyler Construction did an extensive interior restoration of the existing sanctuary. Work included plaster repair, new wood flooring, new lighting and controls, complete new HVAC system, artist painting and numerous other specialties & details. Restoration New wood flooring Plaster repair

Lyman Vocational Rehab

Lyman Vocational Rehab Work Description: Lyman Vocational Rehab was a construction only on a new office building approximately 19,000 SF. Also included in the new building is an area office, a 10,000 SF production/training floor with computer lab, conference room, new staffs break area, and a special services unit for occupational and physical therapy training. […]

Columbia Mills South Carolina State Museum

Columbia Mills South Carolina State Museum Existing Conditions: The Columbia Mills building is listed on the National Register of Historic Places. As a result, any modification to the building must be reviewed and approved by both State Historic Preservation Office and the City of Columbia Planning Division. The existing building is load bearing masonry exterior […]