Repair Receptee Barracks Building 1877
Work Description: The scope of this project focused on repairing already failed or failing components of the 480 person Reception Barracks Building 1877 (58,000 SF). This was a very thorough renovation project that repaired or replaced every major system in the building. Tyler Con-struction coordinated the Designer of Record and facilitated the entire design of building 1877 for Billy W. Jarrett Construction (Prime). The systems repaired were: entry portal roofs; windows; fire detection, alarm, and suppression; interior walls; interior and exterior doors; insulation; interior finishes; flooring; ceilings; plumbing; HVAC systems and controls; electrical service and distribution; lighting; lead and asbestos abatement; Energy Management and Control Systems; and a building information system. This project had a 480 personnel swing space used for barracks while under construction. Construction took place next to a Post Exchange (PX) As such, great precaution was taken throughout the project to ensure the safety of the soldiers coming to and from the PX and that construction itself did not interfere with the PX’s operations. (Certifiable LEED Silver or Higher)
- 480 person barracks
- Renovation of every major system
- Did not interfere with Post Exchange operations