Work Description: Project included the construction of a four-story, precast parking structure on the southwest edge of campus, directly to the southwest of the existing Mental Health Clinic Building 106. It has 418 parking spaces and is 140,478 SF. Key features of the structure include fire protection (alarm and suppression), suicide prevention fencing, security cameras integrated with the VA’s existing security monitoring system, blue call boxes for emergencies, and parking control. All applicable ATFP standards were considered in the design.

Also part of the project was the expansion and repaving of an existing parking lot, and relocation and full-depth roadway construction of a major roadway that acts as the back entrance to the hospital. Also included as part of this project were curb and gutter, storm water piping and retention, striping, signage, site lighting, and sidewalks. Total, we repaved 8,000 SF for the parking lot. Full-depth roadway construction for the road totaled 36,400 SF. New curbing was provided along the roadway. New storm water piping was also installed, and 2 above-ground storm water retention ponds were constructed to manage storm water on site.

  • Four stories
  • 418 parking spaces
  • Advanced safety features
  • Expanded parking lot in addition to garage